Pricing is indicative and will be finalized based on your design requirements.

Project Type
Location (Nearest Major City)
Number of Floors
Number of Rooms
99

83

135

Prevailing Wage

Building Details

Dimensions

231 X 81 X 48

GSF

63,690

Modular Efficiency

109%

Construction Type

Wood Framed

Room Mix

No.

Pc.

Three Bedroom

0

0

King Studio

58

King One

8

Double Queen

33

59%

8%

33%

RaaP Construction

$19.65 M

$309
Per Sq. Ft. 
$198 K
Per Key
RaaP Design & Construction

15 Months

Traditional Site Build

$19.01 M

$298
Per Sq. Ft. 
-3.26
Percent
Difference
Traditional Site Build

23 Months

8
Months Longer

On-Site Hard Construction Cost (Master Format)

Link to methodology and division detail

Division

Total Cost ($)

Cost / Sq. Ft. ($)

Total (%)

GC (%)

Fabricator (%)

Hard Construction
$19.65 M
$309
100%
58%
42%
Building Cost
$15,098,762
$237
77%
50%
50%
03 Concrete
$492,105
$8
3%
39%
61%
04 Masonry
$214,888
$3
1%
100%
0%
05 Metal
$1,010,913
$16
5%
100%
0%
06 Wood & Plastics
$3,496,946
$55
18%
16%
84%
07 Thermal & Moisture Protection
$911,167
$14
5%
41%
59%
08 Openings
$728,765
$11
4%
39%
61%
09 Finishes
$2,771,807
$44
14%
37%
63%
10 Specialties
$0
$0
0%
100%
0%
11 Equipment
$114,000
$2
1%
100%
0%
12 Furnishing
$497,634
$8
3%
100%
0%
13 Special Construction
$234,910
$4
1%
100%
0%
14 Conveying Equipment
$248,468
$4
1%
100%
0%
21 Fire
$267,256
$4
1%
75%
25%
22 Plumbing
$1,718,857
$27
9%
55%
45%
23 HVAC
$683,652
$11
3%
46%
54%
26 Electrical
$1,707,393
$27
9%
77%
23%
Site Work (Estimate)
$1,460,884
$23
7%
100%
0%
31 Earthwork
$379,842
$6
2%
100%
0%
32 Exterior Improvements
$535,230
$8
3%
100%
0%
33 Utilities
$545,811
$9
3%
100%
0%
GC Charges (Estimate)
$1,662,967
$26
8%
100%
0%
01 General Requirements
$600,123
$9
3%
100%
0%
Charges & Fees
$1,062,844
$17
5%
100%
0%