Our 4-Step Design-Build Approach to Drive Savings and Reduce Risks

Project Architect 

1

AoR develops entitlement set and starts design development using a design prototype optimized for fabrication and collaborative design-build. 

2

AoR develops entitlement set and starts design development using a design prototype optimized for fabrication and collaborative design-build. 

Source Drawing

3

Fabricator generates shop drawings early to address and streamline potential production issues. 

Fabricator

Pre-Construction

4

Faster project completion through improved AoR-Fabricator-GC coordination and fewer RFIs & Submittals. 

General Contractor