Our 4-Step Design-Build Approach to Drive Savings and Reduce Risks
Project Architect
1
AoR develops entitlement set and starts design development using a design prototype optimized for fabrication and collaborative design-build.
2
AoR develops entitlement set and starts design development using a design prototype optimized for fabrication and collaborative design-build.
Source Drawing
3
Fabricator generates shop drawings early to address and streamline potential production issues.
Fabricator
Pre-Construction
4
Faster project completion through improved AoR-Fabricator-GC coordination and fewer RFIs & Submittals.
General Contractor